Before
The old roofing, from the front.
Before
Before we start removal, from the backyard.
Old Material Removal
Here we have raked off the old shingles onto strategically placed tarps.
Furring Strips
It is vital that the first layer is clean and done right.
The Team
Our sales rep Tiffany getting first hand knowledge, behind the scenes.
Gutter Vent
Various components of the far edge ventilation.
Gutter Vent
An air intake system flowing between the gutters and roofline.
Blow-in Insulation
Loading the AttiCat Blow-in Insulation machine.
Organization of Discarded Materials
We make sure to contain the mess of the tare off.
Owens Corning Insulation, Storrs, CT
With the blow-in method, minimal insulation is wasted.
First Layers, Storrs, CT
Here are three layers represented, before shingles are installed over them as the final layer of protection.
Water & Ice Shield
The ice and water barrier protects the decking plywood and creates a water tight seal under the shingles.
Blow-In Insulation, Storrs, CT
Bricks of Owens Corning PINK Fiberglass Insulation are fed into the AtticCat machine, where it travels up a pipe into the attic.
Sealing the Ridge Vent
A great shot of the field stone chimney.
Attic Ventilation, Storrs, CT
SmartVent attic materials.
Gutter Ventilation, Storrs, CT
A closer look of the gutter vent.
After
The completed roof with fresh shingles.