
Furring Strips
After the roof was torn off, there was no plywood to be found. Since there was only furring strips, we installed a new deck on top of the old one.

Plywood Installation
Now the new 1/2" CDX plywood was installed on top of the furring strips.

Roof Shingles
After the plywood comes the Ice & Water barrier along with Sythetic underlayment.

Roof Replacement
Now the new roof is installed with Desert Tan Duration shingles.